Skip to contentSkip to footer
De Gerlien van Tiem bv
Menu Close
  • Ship repair
  • Bow thrusters
Close
  • Ship repair
  • Bow thrusters
Solliciteer
De Gerlien van Tiem bv
  • Ship repair
  • Bow thrusters
Geen categorie @en

ms Theresia

7 November 2019

MS Theresia

MS Theresia has soil below and from above, renewed

At the end of August, ms Theresia has been put dry in Dodewaard  to renew the surface of the  front and rear hold.
Thereafter, the ship has come to Druten to lay an entirely new steel floor of Raex 400, 8 mm thick.

Post navigation

Previous
Europort 2019
15 August 2019
Next
MTS Hardi converted from 9 fixed tanks to a tanker with 5 separate tanks
13 November 2019
De Gerlien van Tiem bv

Vragen? Neem contact op

Neem contact op voor vragen, projectbesprekingen of offertes.
Onze specialisten helpen u graag.
  • Offerte aanvragen
  • Informatie opvragen
  • Solliciteren/vacatures
Bezoekadres

Waalbandijk 129
6651 KB Druten

Contact
  • 0487 515 544
  • info@gerlienvantiem.com
Vacatures
Links
  • Nieuwbouw
  • Reparatie en ombouw
  • Spudpalen
  • Boegschroeven
  • Service en onderhoud
  • Over ons
  • Projecten
  • Contact

© 2026 – All Rights Reserved.

The Next Brand